在安裝化工離心泵的時候,需要分(fèn)六部完成具體的操作(zuò),操作得當(dāng)可以(yǐ)讓護工(gōng)
離心泵
在使(shǐ)用時産生非常好的工作狀态(tài),如果(guǒ)安裝不好可能減少泵的壽命,或者無法正常使用。
安裝(zhuāng)前,收到廠(chǎng)家發送的化工離(lí)心泵後要先檢查,有沒有損壞,或者泵内有無進入污垢等,如果有要及時清理,拆卸(xiè),如(rú)果完好無損無污,則可以直(zhí)接安裝。在安裝化工離心泵時先做好泵的基礎平(píng)面,然後凝固後将(jiāng)泵安裝到平面上,看是否水平,然後灌漿孔(kǒng)澆灌水泥(ní)固定。在固定好後再(zài)次檢查水平,是否有傾(qīng)斜。檢測聯軸器的外圓和兩(liǎng)聯軸器端面間隙誤差不能超過0.1毫米。檢(jiǎn)查吸入管路和壓出管理的支(zhī)架是否搭建(jiàn)好。
離心泵
的安裝位置是否吸入管道上安裝控制閥門和過濾裝置,防止污物進入(rù)泵内(圖\文
xiaojikuaipao.top/
)。
中譯英:
In the installation of chemical centrifugal pump when, need six completion of specific operations, operating properly can let workers centrifugal pump in use have a very good working state, if the installation is not good may reduce the pump life, or cannot be used normally.
Before installation, received the factory sends the chemical centrifugal pump after the first examination, there is no damage, or in the pump without entering the dirt, if there is time to clean up, remove, if intact and no pollution, can be installed directly. In the installation of chemical centrifugal pump well pump when the first foundation plane, then after the solidification of the pump is mounted to the plane, see whether level, then watering hole grouting cement fixation. The fixed again after inspection level, whether the tilt. Measurement of coupling and the outer circle of two coupling end clearance error can not be more than 0.1mm. Check the suction pipe and the pressure of management support is built. Centrifugal pump installation position whether inhaled installed on the pipeline control valve and filter, preventing dirt from entering the pump.